
ENR Critical Path Podcast
Subscribe in ParasocialFree on the App Store for iPhone, iPad and Mac. No subscription needed. Once it is installed, tap this link again and the show is yours. Already have it? Open in Parasocial.
About
ENR’s Critical Path Podcast delivers insights from leading industry experts and decision-makers about the latest construction industry innovations, issues and developments.
Also on
Recent episodes
- Brian Batten and Stuart Geiger Talk Coastal Flood Mapping
- All things Water – An Industry Veteran’s Perspective on the Water Sector’s Continued Evolution
- Breaking Down the Handoff Wall: Connecting Design, Construction and Delivery
- Stephen Cavanaugh on Mass Timber’s Rising Popularity
- Skanska Civil’s Geoffrey Bender Can Dig It
- Allie Kelly on solar-powered roads, sustainable land management, and the legacy of The Ray.
- Bluebeam CEO Usman Shuja Talks About Construction Documents and Technology
- Aon Executives Talk AI, Data Centers, and the Risk Trends for Construction
- ENR Critical Path | Special Edition: What Happens After Structural Failure?
- Modernizing Water Assets with High-Performance Polysiloxane Coatings